Projects which had been finished last year
1. Design and construct a closed swimming pool and sporting hall with an administration building project at Physical College, the project value was (6,426,000,000) Iraqi Dinar and (500) days the execution period which had been done by the contractor (Reem Al-Bar & Bahader Gul company).
2. Solve the problem of water leakage in bathrooms and toilets project at (18- Shobat) female dormitory the project value was (316,065,000) Iraqi Dinar which had been done by the contractor (Bayram company).
3. Constructing Physical, Chemical Laboratory and Examination Committee Building project at Basic Education, the project value was (224,655,000) Iraqi Dinar which had been done by the contractor (Barza Hawar company).
4. Providing laboratory`s request for Mechanical department at Engineering college, the project value was (518,770,000) Iraqi Dinar which had been done by five companies.
5. Solving the problem of sewage, rainwater and floodwater at (Shaheed Shawkat male Dormitory), the project value was (115,500,000) Iraqi Dinar which had been done by the contractor (Shang Company).